Rotary Die Head PP Blown Film Machine with Chiller

Rotary Die Head PP Blown Film Machine with Chiller

A: Description
The cylinder and the screw stems of extruder are method of higher-good quality alloy
metal with optimum hardness and strong corrosion resistance after precision
finishing and nitrogen remedy. The extruder can be elevate up to 3meters
in accordance to the technological demands. Method of movie blowing: Bottom
blowing. The coiling unit adopts torque motor to preserve proper pressure and
make rolling even and roll-shifting straightforward.
B: CZPT Parameter

MODLE FB-G-600 FB-G-800
Appropriate material PP
Layfat width of film(mm) 600 800
Thickness of movie(mm) .015-.08
Max.extrusion output 38kg/h 46kg/h
CZPT dia(mm) Φ65 Φ75
CZPT L/D 28:one
CZPT rotation ten-100r/min
Main motor(kw) 15 18.five
Dia of orifice(mm) Φ250 Φ350
Tota energy(kw) 28 36
Weight (T) three 3.five
Dimension LxWxH(M) four.8x2x4 5×2.2×4.2

C: Details Details
1. Extruder Unit
Die Head Materials: Cr40 CZPT Steel
Die Head Heating: 2 Zones
Rotary Die Head: Optional
CZPT and Barrel Substance: 38CrMoALA
CZPT and Barrel Heating:3Zones*3Sets
Heating Ring Substance: Cast Aluminum 
Screen Changer: Handbook Sort
Gear Box: Tough Tooth Area Equipment Box 

two. Take Up Part
‘A’ Shape CZPT Forming Plate: Aluminum Plate Kind
CZPT CZPT Method: H2o CZPT
CZPT Bubble Location Ring: H2o Ring 
Just take Up Motor:Three-Phase Asynchronous Motor with Worm Gear Reducer
Just take Up Rollers Grasp: Air Cylinder 

three. Winder Unit
Second Get Up Unit: Air Cylinder 
Rewinding Station: Double Stations 
Rewinding Motor: Torque Motor 
Pinch Roller: Air Shaft Roller 

D. Soon after provider of XIHU (WEST LAKE) DIS.
one. How long will your engineer reach to our manufacturing facility?
Inside a single 7 days following equipment arrival at your factory.
two. How several times will you complete installing?
We will finish set up and instruction in 15days.
3. What ought to we charge for your engineer?
You must demand for the price of our engineer’s visa, air tickets, hotel, foods, and also their salary 80USD per day per man or woman.
4. How prolonged of your machine’s warranty period?
All our machines have 1 year guarantee after finishing installation.
five. How could we do right after one yr warranty period of time?
We also can offer you our very best soon after services, of course you will afford our technician’s cost.
6. Can you uncover us any engineer in our location?
Of system, we will check out and tell you as shortly as achievable.

E.XIHU (WEST LAKE) DIS. Workshop

Any question please really feel freely to make contact with with us! 
MS.WendyPan

 

Rotary Die Head PP Blown Film Machine with Chiller